Our composite deck boards have been used in countless commercial projects throughout the United Kingdom. The case studies on this page will give you an idea of what we have to offer whilst demonstrating the exceptional quality and versatility of our products; as you will see, TimberTech’s products are ideal for all kinds of different decking projects, from public houses and holiday homes to nurseries, office buildings, and more.
Select one of the past decking projects listed below, or call 029 2080 3756 to find out more about TimberTech’s product range.
Celtic Manor Lodges
We received a call from Lodgico, a contracting company who at the time were building a series of holiday lodges at the luxurious Celtic Manor resort in South Wales. Lodgico needed 700m2 of decking for the outdoor areas of the 10 lodges, and they decided that our stunning ReliaBoard range was perfect for their brief. View Case StudyDownload Case Study
Copthorne Hotel
The owners of this four-star hotel – which is situated beside a large, tranquil lake – came to us in search of a suitable decking solution for their outdoor area. After an initial consultation, we recommended EasyClean Terrain, our popular capped composite decking range. The sleek Silver Maple design is perfectly suited to the hotel’s picturesque lakeside location! View Case StudyDownload Case Study
NASDAQ Offices
We supplied 63m2 of VertiGrain 2 decking for the roof of the NASDAQ offices in London. Oktra, the office fitting specialists chosen to oversee this refurbishment, decided that TimberTech deck boards were the best choice for the job due to their durability, their attractive appearance, and their minimal maintenance requirements. View Case StudyDownload Case Study
Cardiff Pointe Development
This luxurious complex in Cardiff Bay was developed by Kier Living, a distinguished property development firm with an outstanding reputation. They used TimberTech boards to give Cardiff Pointe’s roof terraces a suitably modern finish. View Case StudyDownload Case Study
RES Offices
RES is an organisation that’s dedicated to the development of renewable energy solutions Having decided that TimberTech’s recycled composite deck boards would be perfectly aligned with the company’s environmentally-conscious image, the RES bosses specified 75m2 of our VertiGrain 2 decking, which was used to revamp the curved walkway outside their head office in Hertfordshire. View Case StudyDownload Case Study
Branksome Children’s Nursery
The slip and splinter-resistant properties of our deck boards make them a safe and sensible choice for an environment with lots of young children. The owners of Branksome Children’s Nursery in Dorset realised this, and subsequently specified 45m2 of VertiGrain 2 decking for their nursery’s outdoor play area. View Case StudyDownload Case Study
Tenby Lifeboat Station
Tenby’s iconic lifeboat station was rescued from demolition and turned into a four-bedroom holiday home with the help of TimberTech’s VertiGrain deck boards, which were deemed perfect for the challenging maritime environment. This project was featured on Channel 4’s Grand Designs programme. View Case StudyDownload Case Study
Busy Bees Day Children’s Nursery
Our bright, beautiful deck boards were selected to spearhead the refurbishment of this nursery’s play area. The nursery provider stated that they had chosen TimberTech because of our “totally reliable, great-looking product that doesn’t split or splinter”. View Case StudyDownload Case Study
Yorkshire Care Home
We supplied more than 1,400m2 of composite decking for a pair of care homes in South Yorkshire. The people behind this project had initially specified solid timber decking, but given the nature of the development and the need for a safe, slip-resistant surface, it was eventually decided that our deck boards would be a superior choice for the task at hand. View Case StudyDownload Case Study
Leicester City FC
Former Premier League champions Leicester City FC used more than 500m2 of TimberTech decking to construct an outdoor walkway at Seagrave, the club's £100m training complex. The new facility opened in December 2020 after almost two years of construction, and team's first training session at Seagrave took place on Christmas Eve. View Case Study